Seth its been some time, but I recall on the first pitch that you cut out the runout if you have along sling(4 ft) and girth hitch the flake/block. As long as your slings are long enough this works well. For the finish on the last pitch it doesn't actually join Shockleys to the left but trends right on an independent line to the small ledge with tree and slings.